Another Machine From ACETECH Has Been Sent To Poland.

By: ACETECH, Time: 2021-06-16 3 Comments
Another Machine From ACETECH Has Been Sent To Poland.
Our three-in-one pelletizer ACS800/120 which output capacity around 450-480kg/h set out for Poland.
Early in the morning, the truck we ordered had already stopped at the factory gate, waiting for our workers to go to work.
At eight o'clock, the worker began to instruct the truck driver to reverse the truck into the factory so that our workers could use the driving and forklift trucks to load the machines into the container.
After the truck arrived at the designated location of the factory building, the workers began the loading work. Look, our workers are cautious, sweaty and energetic.
After a morning's hard work, we have finished more than half of the shipment. Shipment will follow in the afternoon.
At 3 p.m., the shipment was completed. The workers smiled happily.
The van is leaving.~~